May 26, 2006
(Natural Resources)
 

The following is being distributed at the request of the Canada-Newfoundland and Labrador Offshore Petroleum Board:

Weekly Public Status Report
Oil and Gas Activities Offshore Newfoundland and Labrador
Issued as of: May 22, 2006
(Also available on the Internet � //www.cnlopb.nl.ca)

GEOSCIENTIFIC PROGRAMS
Program Number
Operator/Survey
(Location)
Vessel/
Contractor
Start Date Kms Completed
(Total Planned)
Comments
8926-H032-015E
Husky Oil Operations Limited/
West Bonne Bay
Anticosti/Fugro Jacques GeoSurveys Inc.

May 17, 2006

0

Preparing for acquisition.

HIBERNIA DRILLING PROGRAM
Well/Location
(Unique Well Identifier)
Installation Spud Date Current Depth
(Projected Total Depth)

Current Status

HMDC Hibernia B-16 54W
46� 45� 01.427" N
48� 46� 53.654" W
Licence: PL 1001
(354B164650048454)
Hibernia Platform
M71 (East Rig)
May 20, 2006
(Sidetrack date)

6,338 m
(7,198 m)

Commenced B-16 54W sidetrack on May 20, 2006.
HMDC Hibernia B-16 55
46� 45�01.796" N
48� 46� 54.527" W
Licence: PL 1001
(355B164650048450
Hibernia Platform
M72 (West Rig)

---

187 m
(300m)

Fish recovered on May 20, 2006 � preparing to drill conductor hole and set conductor casing.
TERRA NOVA DRILLING PROGRAM
Well/Location
(Unique Well Identifier)
Installation Spud Date Current Depth
(Projected Total Depth)
Current Status
Petro-Canada et al Terra Nova
G-90 7
(307G904630048150)
46�29�21.333"N
48�27�36.929"W
Licence: PL 1002
Henry Goodrich September 22, 2005 4,697 m
(4,697 m)
Well terminated on May 20, 2006 � rig moved to Terra Nova F-88 4.
Petro-Canada et al Terra Nova
F-88 4
(304F88463d0048150)
46�27�19.802" N
48�27�41.479" W
Licence: PL 1002
Henry Goodrich

---

0 m
(5,626 m)

Preparing to spud well.
WHITE ROSE DRILLING PROGRAM
Well/Location
(Unique Well Identifier)
Installation Spud Date Current Depth
(Projected Total Depth)
Current Status
Husky Oil et al White Rose
O-28Y
46� 47� 45.834" N
48� 03� 28.559" W
Licence: SDL 1024
(300O284650048002)
Rowan Gorilla VI May 10, 2006 (Sidetrack date)

3,318 m
(3,367 m)

Currently drilling 311mm hole.
Husky Oil et al White Rose
E-18 6
46� 47" 21.927" N
48� 02 36.529" W
Licence: PL 1006
(306E184650048000)
GSF Grand Banks March 6, 2006

1,000 m
(4,668 m)

Suspended on March 18, 2006 with 406 mm casing set and cemented � To be re-entered at a later date.
Husky Oil et al White Rose
E-18 5
46� 47� 21.763" N
48� 02� 38.521" W
Licence: PL 1006
(305E184650048000)
GSF Grand Banks March 6, 2006

1,000 m
(4,263 m)

Suspended on March 14, 2006 with 406 mm casing set and cemented � To be re-entered at a later date.
Husky Oil et al White Rose
E-18 4
46� 47� � 20.990" N
48� 02� 36.835" W
Licence: PL 1006
(304E184650048000)
GSF Grand Banks November 11, 2005

4,619 m
(4,619 m)

Well terminated on April 15, 2006 � Currently conducting rig maintenance.
Husky Oil et al White Rose B-07 5
46 46' 14.11" N
48 00' 36.66" W
Licence: PL 1006
(305B074650048000)
GSF Grand Banks October 6, 2003

4,898m
(4,903 m)

GSF Grand Banks arrived at White Rose B-07 5 on May 15, 2006 � preparing to complete well.
Husky Oil et al White Rose B-07 7
46 46' 13.49" N
48 00' 38.61" W
Licence: PL 1006
(307B074650048000)
GSF Grand Banks October 12, 2003

231m

914 mm hole drilled, 762 mm conductor casing set and cemented.
Husky Oil et al White Rose
B-07 8
46 46� 14.24" N
48 00� 38.16"W
Licence: PL 1006
(308B074650048000)
GSF Grand Banks October 2, 2003

3,395 m
(3,395 m)

Suspended on February 22, 2006 at final total depth with the 244 mm production casing set and cemented � Xmas tree installed.
Husky Oil et al White Rose
J-22 2
46� 51� 39.62" N
48� 03� 39.93" W
Licence: PL 1006
(302J224700048000)
GSF Grand Banks April 24, 2004

1,215 m

406 mm hole section drilled. 340 mm casing set and cemented.
Note: The above status includes wells that are currently in the drilling or completion phase. Additional information on the status of various development wells for the Hibernia, Terra Nova and White Rose projects is available from the C-NLOPB�s Web site under RESOURCE INFORMATION. Click on Development wells (White Rose Field) for additional information on the status of White Rose development wells.

Contact: Canada-Newfoundland and Labrador Offshore Petroleum Board, (709) 778-1400.

_______________________________________

Glossary of Petroleum Terminology

BOP/BOP Stack: Blowout preventers/blowout preventer stack - an assembly of heavy-duty valves attached to the wellhead to control well pressure and prevent a blowout.
Casing: Steel pipe set in a well to prevent the hole from sloughing or caving and to enable formations to be isolated (there may be several strings of casing in a well, one inside the other).
Cementing: Pumping a liquid slurry of cement, water and other additives behind a string of casing to isolate formations.
Completion/

Completed:

The activities necessary to prepare a well for the production of oil or gas or the injection of water or gas into the reservoir.
Fish: An object lost (or stuck) in the wellbore obstructing operations.
Fishing: Operations to recover fish.
Injecting: Injecting water or gas into the reservoir for the purpose of maintaining reservoir pressure, maximizing oil recovery and conserving resources.
Liner: A length of casing suspended from the base of a previously installed casing string (a liner does not extend back to the surface of the well).
Logging: Acquisition of downhole data using tools run in the well, usually on wireline.
Perforate/

Perforating:

Piercing the casing and cement using shaped explosive charges to provide a flow path for formation fluids.
Producing/

Production:

Flowing oil and/or gas from a well to the production systems.
Production Tree: An arrangement of heavy-duty valves and fittings installed on the wellhead to control flow from the well and/or to facilitate injection operations.
Reaming: An operation to restore a wellbore to its original diameter (occasionally, a wellbore will cave in).
Seismic kilometers: The total number of kilometres of data recorded in a geophysical program.
Shut-in: A well in which the valves in the production tree have been closed to cease production or injection operation on a well.
Sidetracking: The operation of deviating a well around a fish.
Spud: The initial penetration of the ground or sea floor - the start of the drilling operation.
Suspension/

Suspend:

The temporary cessation of drilling or production operations in a well.
Well Workover: A program of work performed on an existing well.
Wellbore: The hole drilled by the drill bit.
Wellhead: Steel equipment installed at the surface of the well containing an assembly of heavy duty hangars and seals (the wellhead is used to support the weight of casing strings hung it and to contain well pressure).

2006 05 26                                              10:40 a.m.