GEOSCIENTIFIC PROGRAMS
Program Number
Operator/Survey
(Location) |
Vessel/
Contractor |
Start Date |
Kms Completed
(Total Planned) |
Comments |
8924-G005-015P
GSI/Labrador 2D Seismic Survey |
M/V GSI Pacific/
Geophysical
Service Inc. |
June 30, 2006 |
4324 CMP Km
(20,671 CMP Km) |
240 CMP Km recorded during reporting
period.. |
8924-H032-006E
Husky Oil Operations Limited/Fortune 3D Seismic Survey |
Western Regent/
Western Geco |
July 20, 2006 |
18324 CMP Km
(27,855 CMP) |
9074 CMP Km recorded during
reporting period. |
8929-E038-002E
ExxonMobil Canada Ltd/Orphan Basin Resistivity Sruvey |
REM Angler/Electromagnetic
Geoservices A/S |
August 7, 2006 |
0 CMP km(1231 CMP
Km) |
Transiting to survey location. |
HIBERNIA DRILLING PROGRAM
Well/Location
(Unique Well Identifier) |
Installation |
Spud Date |
Current Depth
(Projected Total Depth) |
Current Status |
HMDC Hibernia B-16 54W
46� 45� 01.427" N
48� 46� 53.654" W
Licence: PL 1001
(354B164650048454) |
Hibernia Platform
M71 (East Rig) |
May 20, 2006
(Sidetrack date) |
7,090 m
(7,090 m) |
Plugged and abandoned on July 21,
2006. |
HMDC Hibernia B-16 57
46� 45� 01.484" N
48� 46� 53.738"W
Licence PL 1001
(357B164650048450) |
Hibernia Platform
M71 (East Rig) |
July 26, 2006 |
301 m
(TBD) |
Pre-drill to conductor casing
setting depth on B-16 57 complete � conducting rig maintenance
in preparation for B-16 59. |
HMDC Hibernia B-16 55
46� 45�01.796" N
48� 46� 54.527" W
Licence: PL 1001
(355B164650048450 |
Hibernia Platform
M72 (West Rig) |
--- |
299 m
(300m) |
Continuing rig maintenance. |
TERRA NOVA DRILLING PROGRAM
Well/Location (NAD83)
(Unique Well Identifier) |
Installation |
Spud Date |
Current Depth
(Projected Total Depth) |
Current Status |
Petro-Canada et al Terra Nova
F-88 4
46�27�19.802" N
48�27�41.479" W
Licence: PL 1002
(304F884630048150) |
Henry Goodrich |
May 22, 2006 |
5,617 m
(5,617 m) |
Completions tubing run � Xmas tree
landed. |
WHITE ROSE DRILLING PROGRAM
Well/Location (NAD83)
(Unique Well Identifier) |
Installation |
Spud Date |
Current Depth
(Projected Total Depth) |
Current Status |
Husky Oil et al White Rose
E-18 6
46� 47" 21.927" N
48� 02 36.529" W
Licence: PL 1006
(306E184650048000) |
GSF Grand Banks |
March 6, 2006 |
1,000 m
(4,668 m) |
Suspended on March 18, 2006 with 406
mm casing set and cemented � To be re-entered at a later date. |
Husky Oil et al White Rose
E-18 5
46� 47� 21.763" N
48� 02� 38.521" W
Licence: PL 1006
(305E184650048000) |
GSF Grand Banks |
March 6, 2006 |
4,286 m
(4,286 m) |
Running 178mm liner. |
Husky Oil et al White Rose
B-07 7
46 46' 13.49" N
48 00' 38.61" W
Licence: PL 1006
(307B074650048000) |
GSF Grand Banks |
October 12, 2003 |
231m |
914 mm hole drilled, 762 mm
conductor casing set and cemented on October 13, 2006 � to be
re-entered at a later date. |
Husky Oil et al White Rose
J-22 2
46� 51� 39.62" N
48� 03� 39.93" W
Licence: PL 1006
(302J224700048000) |
GSF Grand Banks |
April 24, 2004 |
1,215 m |
406 mm hole selection drilled, 340
mm casing set and cemented on April 28, 2004 � to be re-entered
at a later date. |
Note: The above status includes
wells that are currently in the drilling or completion phase.
Additional information on the status of various development
wells for the Hibernia, Terra Nova and White Rose projects is
available from the C-NLOPB�s web site under RESOURCE
INFORMATION. Click on Development wells (White Rose Field) for
additional information on the status of White Rose development
wells that have been completed. |
DELINEATION
DRILLING PROGRAM
Well/Location (NAD83)
(Unique Well Identifier) |
Installation |
Spud Date |
Current Depth (Projected Total
Depth) |
Current Status |
Husky Oil et al West Bonne Bay
F-12
46�31� 22.024"N
48�17� 27.216"W
Licence: SDL 1040
(300F124640048150) |
Rowan Gorilla VI |
July 1, 2006 |
4,033
(4,631 m) |
Drilling 216mm hole. |