GEOSCIENTIFIC PROGRAMS
Program Number
Operator/Survey
(Location) |
Vessel/
Contractor |
Start Date |
Kms Completed
(Total Planned) |
Comments |
8924-H032-004E
Husky Oil Operations Limited/Northern Jeanne d�Arc Basin 3D seismic
survey |
M/V
Western Neptune/Western Geco Canada |
October 3, 2005 |
22,363 CMP Km
(32,560 CMP Km) |
CMP
Km recorded during reporting period. Acquisition terminated on November
8. |
HIBERNIA DRILLING PROGRAM
Well/Location
(Unique Well Identifier) |
Installation |
Spud Date |
Current Depth
(Projected Total Depth) |
Current Status |
HMDC Hibernia B-16 52Z
46 45' 02.082" N
48 46' 54.945" W
Licence: PL 1001
(352B164650048451) |
Hibernia Platform
M72 (West Rig) |
March 23, 2005 |
6,950 m
(6,950 m) |
Completing well. |
HMDC Hibernia B-16 54
46� 45� 01.427" N
48� 46� 53.654" W
Licence: EL 1093
(354B164650048450) |
Hibernia Platform
M71 (East Rig) |
August 1, 2005 |
5,925 m
(8,174 m) |
273/244 mm casing cemented. Running logs. |
HMDC Hibernia B-16 13
46� 45� 2.254" N
48� 46� 54.530" W
Licence: PL 1001
(313B164650048450) |
Hibernia Platform
M72 (West Rig) |
October 28, 2005 |
500 m
(6,259 m) |
508
mm casing cemented. Well temporarily suspended. Rig skidded to Hibernia
B-16 52Z |
TERRA NOVA DRILLING PROGRAM
Well/Location
(Unique Well Identifier) |
Installation |
Spud Date |
Current Depth
(Projected Total Depth) |
Current Status |
Petro-Canada et al Terra Nova G-90 6Z
46� 29� 21.445" N
48� 27� 36.854" W
Licence: PL 1002
(306G904630048151) |
Henry Goodrich |
October 19, 2005
(sidetrack date) |
2,927 m
(5,946 m) |
Pressure testing BOP stack. |
WHITE ROSE DRILLING PROGRAM
Well/Location
(Unique Well Identifier) |
Installation |
Spud Date |
Current Depth
(Projected Total Depth) |
Current Status |
Husky Oil et al White Rose
E-18 4
46� 47� 20.990" N
48� 02� 36.835" W
Licence: PL 1006
(304E184650048000) |
GSF
Grand Banks |
November 11, 2005 |
495 m
(4,608m) |
Drilling 508 mm hole section. |
Husky Oil et al White Rose
B-07 3
46� 46�13.14" N
48� 00�36.92" W
Licence: SDL 1022
(303B074650048000) |
GSF
Grand Banks |
October 9, 2005 |
5,137 m
(5,137 m) |
Completing well. |
Husky Oil et al White Rose B-07 5
46 46' 14.11" N
48 00' 36.66" W
Licence: SDL 1022
(305B074650048000) |
GSF
Grand Banks |
October 6, 2003 |
1,025 m |
508
mm hole drilled, 406 mm surface casing set and cemented. |
Husky Oil et al White Rose B-07 7
46 46' 13.49" N
48 00' 38.61" W
Licence: SDL 1022
(307B074650048000) |
GSF
Grand Banks |
October 12, 2003 |
231m |
914
mm hole drilled, 762 mm conductor casing set and cemented. |
Husky Oil et al White Rose
B-07 8
46 46� 14.24" N
48 00� 38.16"W
Licence: SDL 1022(308B074650048000) |
GSF
Grand Banks |
October 2, 2003 |
231 m |
914
mm hole drilled, 762 mm conductor casing set and cemented. |
Husky Oil et al White Rose
J-22 2
46� 51� 39.62" N
48� 03� 39.93" W
Licence: SDL 1028
(302J224700048000) |
GSF
Grand Banks |
April 24, 2004 |
1, 215 m |
406
mm hole section drilled, 340 mm casing set and cemented. |
Note: The above status includes wells that are currently in the drilling
or completion phase. Additional information on the status of various
development wells for the Hibernia, Terra Nova and White Rose projects
is available from the C-NLOPB�s website under RESOURCE INFORMATION.
Click on Development wells (White Rose Field) for additional information
on the status of White Rose development wells. |