GEOSCIENTIFIC PROGRAMS
Program Number
Operator/Survey
(Location) |
Vessel/
Contractor |
Start Date |
Kms Completed(Total Planned) |
Comments |
8926-H029-006E
HMDC/Wellsite Survey Hibernia South |
M/V
Maersk Placentia/Fugro Jacques Geosurveys |
September 26, 2005 |
170 Km
(-800Km) |
Acquisition terminated on November 1. |
8924-H032-004E
Husky Oil Operations Limited/Northern Jeanne d�Arc Basin 3D seismic
survey |
M/V
Western Neptune/Western Geco Canada |
October 3, 2005 |
22,363 CMP Km
(32,560 CMP Km) |
4,739 CMP Km recorded during reporting period. |
HIBERNIA DRILLING PROGRAM
Well/Location
(Unique Well Identifier) |
Installation |
Spud Date |
Current Depth
(Projected Total Depth) |
Current Status |
HMDC Hibernia B-16 52Z
46 45' 02.082" N
48 46' 54.945" W
Licence: PL 1001
(352B164650048451) |
Hibernia Platform
M72 (West Rig) |
March 23, 2005 |
6,950 m
(6,950 m) |
Preparing to re-enter well for completion operations.. |
HMDC Hibernia B-16 54
46� 45� 01.427" N
48� 46� 53.654" W
Licence: EL 1093(354B164650048450) |
Hibernia Platform
M71 (East Rig) |
August 1, 2005 |
5,925 m
(8,174 m) |
Drilling 311 mm hole section. |
HMDC Hibernia B-16 13
46� 45� 2.254" N
48� 46� 54.530" W
Licence: PL 1001(313B164650048450) |
Hibernia Platform
M72 (West Rig) |
October 28, 2005 |
500 m
(6,259 m) |
508
mm casing cemented. Well temporarily suspended. Rig skidded to Hibernia
B-16 52Z |
TERRA NOVA DRILLING PROGRAM
Well/Location
(Unique Well Identifier) |
Installation |
Spud Date |
Current Depth
(Projected Total Depth) |
Current Status |
Petro-Canada et al Terra Nova G-90 6Z
46�29� 21.445" N
48�27� 36.854" W
Licence: PL1002(306G904630048151) |
Henry Goodrich |
October 19, 2005(sidetrack date) |
2,627 m
(5,946 m) |
Drilling 343 mm hole section. |
WHITE ROSE DRILLING PROGRAM
Well/Location
(Unique Well Identifier) |
Installation |
Spud Date |
Current Depth
(Projected Total Depth) |
Current Status |
Husky Oil et al White Rose
B-07 3
46� 46�13.14" N
48� 00�36.92" W
Licence: SDL 1022(303B074650048000) |
GSF
Grand Banks |
October 9, 2005 |
5,137 m
(5,137 m) |
Completing well. |
Husky Oil et al White Rose B-07 5
46 46' 14.11" N
48 00' 36.66" W
Licence: SDL 1022
(305B074650048000) |
GSF
Grand Banks |
October 6, 2003 |
1,025 m |
508
mm hole drilled, 406 mm surface casing set and cemented. |
Husky Oil et al White Rose B-07 7
46 46' 13.49" N
48 00' 38.61" W
Licence: SDL 1022
(307B074650048000) |
GSF
Grand Banks |
October 12, 2003 |
231m |
914
mm hole drilled, 762 mm conductor casing set and cemented. |
Husky Oil et al White Rose
B-07 8
46 46� 14.24" N
48 00� 38.16"W
Licence: SDL 1022 |
GSF
Grand Banks |
October 2, 2003 |
231 metres |
914
mm hole drilled, 762 mm conductor casing set and cemented. |
Husky Oil et al White Rose E-18 3
46 47' 22.528" N
48 02' 38.052" W
Licence: SDL 1024(303E184650048000) |
GSF
Grand Banks |
October 8, 2004 |
4,726 m
(4,726 m) |
Completing well. |
Note: The above status includes wells that are currently in the drilling
or completion phase. Additional information on the status of various
development wells for the Hibernia, Terra Nova and White Rose projects
is available from the C-NLOPB�s website under RESOURCE INFORMATION.
Click on Development wells (White Rose Field) for additional information
on the status of White Rose development wells. |