GEOSCIENTIFIC PROGRAMS
Program Number
Operator/Survey
(Location) |
Vessel/
Contractor |
Start Date |
Kms Completed
(Total Planned) |
Comments |
8924-C047-002E
Chevron Canada
Resources Orphan Basin 3D seismic survey |
M/V Geco Diamond/
WesternGeco Canada |
May 12, 2005 |
151,432 CMP km
(157,419 CMP km) |
7,648 CMP km recorded during
reporting period. |
8924-C047-002E
Chevron Canada
Resources Orphan Basin 3D seismic survey |
M/V Patriot
WesternGeco Canada |
June 22, 2005 |
112,273 CMP km
(140,894 CMP km) |
4,923 CMP km recorded during
reporting period. |
8924-C149-002E
ConocoPhillips Canada/South Newfoundland 3D seismic survey |
M/V Western Neptune/WesternGecoCanada |
June 14, 2005 |
71,851 CMP km
(87,809 CMP km) |
0 CMP km recorded during
reporting period. |
8924-G005-014P Geophysical
Service Inc./Labrador Shelf 2D seismic survey |
Gulf Pacific/
Geophysical Service Incorporated |
June 17, 2005 |
11,119 km
(14,225 km) |
1029 km recorded during
reporting period. |
HIBERNIA DRILLING PROGRAM
Well/Location
(Unique Well Identifier) |
Installation |
Spud Date |
Current Depth
(Projected Total Depth) |
Current Status |
HMDC Hibernia B-16 52Z
46 45' 02.082" N
48 46' 54.945" W
Licence: PL 1001
(352B164650048451) |
Hibernia Platform
M72 (West Rig) |
March 23, 2005 |
5,161 m
(6,718 m) |
Preparing to drill 216 mm hole
section to TD. |
HMDC Hibernia B-16 54
46� 45� 01.427"N
48� 46� 53.654"W
(Surface)
Licence: EL 1093
(354B164650048450) |
Hibernia Platform
M71 (East rig) |
August 1, 2005 |
3,000 m
(8,174 m) |
Drilling 311 mm hole section. |
TERRA NOVA DRILLING PROGRAM
Well/Location
(Unique Well Identifier) |
Installation |
Spud Date |
Current Depth
(Projected Total Depth) |
Current Status |
Petro-Canada et al Terra Nova
G-90 6
46� 29� 21.445� N
48� 27� 36.854� W
Licence: PL 1002
(306G90463J0048350) |
Henry
Goodrich |
August 15,
2005 |
3,342 m(5,943
m) |
Well temporarily suspended �
preparing to skid rig to new well slot. |
WHITE ROSE DRILLING PROGRAM
Well/Location
(Unique Well Identifier) |
Installation |
Spud Date |
Current Depth
(Projected Total Depth) |
Current Status |
Husky Oil et al White Rose
B-19
46� 48� 11.20" N
48� 02� 01.43� W
Licence: PL 1006
(300B194650048000) |
Rowan Gorilla VI |
August 22, 2005 |
1,899 m
(3,218 m) |
Lower portion of B-19 has been
plugged and abandoned after reaching final total depth of
3,201 metres. B-19Z sidetrack commenced on September 16,
2005 � currently drilling 311 mm hole at 1,899 m at B-19Z. |
Husky Oil et al White Rose B-07
5
46 46' 14.11" N
48 00' 36.66" W
Licence: SDL 1022
(305B074650048000) |
GSF Grand Banks |
October 6, 2003 |
1,025 m |
508 mm hole drilled, 406 mm
surface casing set and cemented. |
Husky Oil et al White Rose B-07
7
46 46' 13.49" N
48 00' 38.61" W
Licence: SDL 1022
(307B074650048000) |
GSF Grand Banks |
October 12, 2003 |
231m |
914 mm hole drilled, 762 mm
conductor casing set and cemented. |
Husky Oil et al White Rose B-07
8
46 46' 14.24" N
48 00' 38.16" W
Licence: SDL 1022
(308B074650048000) |
GSF Grand Banks |
October 2, 2003 |
231 m |
914 mm hole drilled, 762 mm
conductor casing set and cemented. |
Husky Oil et al White Rose J-22
2
46 51' 39.62" N
48 03' 39.93" W
Licence: SDL 1028
(302J224700048000) |
GSF Grand Banks |
April 24, 2004 |
1,215 m |
406 mm hole section drilled, 340
mm casing set and cemented. |
Husky Oil et al White Rose B-07
9
46 46' 14.521" N
48 00' 41.883" W
Licence: SDL 1022
(309B074650048000) |
GSF Grand Banks |
September 22, 2004 |
4,405 m
(4,405 m) |
Well completed, rig moved to
central glory hole. |
Husky Oil et al White Rose E-18
2
46 47' 21.414" N
48 02' 41.048" W
Licence: SDL 1024
(302E184650048000) |
GSF Grand Banks |
September 30, 2004 |
5,390 m
(5,390 m) |
Suspended at final total depth
after performing wellbore clean up and repairing liner top �
to be re-entered for completion at a later date.
|
Husky Oil et al White Rose E-18
3
46 47' 22.528" N
48 02' 38.052" W
Licence: SDL 1024
(303E184650048000) |
GSF Grand Banks |
October 8, 2004 |
4,726 m
(4,726 m) |
Suspended at final total depth
after performing wellbore clean up and attempting
perforations � to be re-entered for completion at a later
date. |
Note: The above status includes
wells that are currently in the drilling or completion
phase. Additional information on the status of various
development wells for the Hibernia, Terra Nova and White
Rose projects is available from the C-NLOPB�s website under
RESOURCE INFORMATION. Click on Development wells (White Rose
Field) for additional information on the status of White
Rose development wells. |