NLIS 8
September 12, 2005
(Natural Resources)
 

The following is being distributed at the request of the Canada-Newfoundland and Labrador Offshore Petroleum Board:

Weekly Public Status Report
Oil and Gas Activities Offshore Newfoundland and Labrador
Issued as of: September 5, 2005
(Also available on the Internet � //www.cnlopb.nl.ca )

GEOSCIENTIFIC PROGRAMS
Program Number
Operator/Survey
(Location)
Vessel/
Contractor
Start Date Kms Completed
Total Planned)
Comments
8924-C047-002E
Chevron Canada
Resources Orphan Basin 3D seismic survey
M/V Geco Diamond/
WesternGeco Canada
May 12, 2005

138,041 CMP km
(157,419 CMP km)

10,728 CMP km recorded during reporting period.
8924-C047-002E
Chevron Canada
Resources Orphan Basin 3D seismic survey
M/V Patriot
WesternGeco Canada
June 22, 2005

98,798 CMP km
(140,894 CMP km)

12,082 CMP km recorded during reporting period.
8924-C149-002E
ConocoPhillips Canada/South Newfoundland 3D seismic survey
M/V Western Neptune/WesternGecoCanada June 14, 2005

71,851 CMP km
(87,809 CMP km)

2,850 CMP km recorded during reporting period.
8924-G005-014P Geophysical Service Inc./Labrador Shelf 2D seismic survey Gulf Pacific/
Geophysical Service Incorporated
June 17, 2005

10,090 km
(14,225 km)

753 km recorded during reporting period.
HIBERNIA DRILLING PROGRAM
Well/Location
(Unique Well Identifier)
Installation Spud Date Current Depth
(Projected Total Depth)

Current Status

HMDC Hibernia B-16 52Z
6 45' 02.082" N
48 46' 54.945" W
Licence: PL 1001
(352B164650048451)
Hibernia Platform
M72 (West Rig)

March 23, 2005

5,161 m
(6,718 m)

Logging prior to running 244 mm casing.
HMDC Hibernia B-16 54
46� 45� 01.427"N
48� 46� 53.654"W
(Surface)
Licence: EL 1093
(354B164650048450)
Hibernia Platform
M71 (East rig)
August 1, 2005

962 m
(8,174 m)

Drilling 406 mm hole section.
TERRA NOVA DRILLING PROGRAM
Well/Location
(Unique Well Identifier)
Installation Spud Date Current Depth
(Projected Total Depth)
Current Status
Petro-Canada et al Terra Nova G-90 6
46� 29� 21.445� N
48� 27� 36.854� W
Licence: PL 1002
(306G90463J0048350)
Henry
Goodrich

August 15, 2005

3,056 m
(5,943 m)

Drilling 343 mm hole section.
WHITE ROSE DRILLING PROGRAM
Well/Location
(Unique Well Identifier)
Installation Spud Date Current Depth
(Projected Total Depth)
Current Status
Husky Oil et al White Rose
B-19
46� 48� 11.20" N
48� 02� 01.43� W
Licence: PL 1006
(300B194650048000)
Rowan Gorilla VI August 22, 2005 2,822 m
(3,218 m)
Drilling 311 mm hole section.
Husky Oil et al White Rose B-07 5
46 46' 14.11" N
48 00' 36.66" W
Licence: SDL 1022
(305B074650048000)
GSF Grand Banks October 6, 2003

1,025 m

508 mm hole drilled, 406 mm surface casing set and cemented.
Husky Oil et al White Rose B-07 7
46 46' 13.49" N
48 00' 38.61" W
Licence: SDL 1022
(307B074650048000)
GSF Grand Banks October 12, 2003

231m

914 mm hole drilled, 762 mm conductor casing set and cemented.
Husky Oil et al White Rose B-07 8
46 46' 14.24" N
48 00' 38.16" W
Licence: SDL 1022
(308B074650048000)
GSF Grand Banks October 2, 2003

231 m

914 mm hole drilled, 762 mm conductor casing set and cemented.
Husky Oil et al White Rose J-22 2
46 51' 39.62" N
48 03' 39.93" W
Licence: SDL 1028
(302J224700048000)
GSF Grand Banks April 24, 2004

1,215 m

406 mm hole section drilled, 340 mm casing set and cemented.
Husky Oil et al White Rose B-07 9
46 46' 14.521" N
48 00' 41.883" W
Licence: SDL 1022
(309B074650048000)
GSF Grand Banks September 22, 2004 4,405 m
(4,405 m)
Perforating well.
Husky Oil et al White Rose E-18 2
46 47' 21.414" N
48 02' 41.048" W
Licence: SDL 1024
(302E184650048000)
GSF Grand Banks September 30, 2004

5,390 m
(5,390 m)

Suspended at final total depth after performing wellbore clean up and repairing liner top � to be re-entered for completion at a later date.
Husky Oil et al White Rose E-18 3
46 47' 22.528" N
48 02' 38.052" W
Licence: SDL 1024
(303E184650048000)
GSF Grand Banks October 8, 2004

4,726 m

(4,726 m)

Suspended at final total depth after performing wellbore clean up and attempting perforations � to be re-entered for completion at a later date.
Note: The above status includes wells that are currently in the drilling or completion phase. Additional information on the status of various development wells for the Hibernia, Terra Nova and White Rose projects is available from the C-NLOPB�s website under RESOURCE INFORMATION. Click on Development wells (White Rose Field) for additional information on the status of White Rose development wells.

Contact: Canada-Newfoundland and Labrador Offshore Petroleum Board, (709) 778-1400.

_______________________________________

Glossary of Petroleum Terminology

BOP/BOP Stack: Blowout preventers/blowout preventer stack - an assembly of heavy-duty valves attached to the wellhead to control well pressure and prevent a blowout.
Casing: Steel pipe set in a well to prevent the hole from sloughing or caving and to enable formations to be isolated (there may be several strings of casing in a well, one inside the other).
Cementing: Pumping a liquid slurry of cement, water and other additives behind a string of casing to isolate formations.
Completion/

Completed:

The activities necessary to prepare a well for the production of oil or gas or the injection of water or gas into the reservoir.
Fish: An object lost (or stuck) in the wellbore obstructing operations.
Fishing: Operations to recover fish.
Injecting: Injecting water or gas into the reservoir for the purpose of maintaining reservoir pressure, maximizing oil recovery and conserving resources.
Liner: A length of casing suspended from the base of a previously installed casing string (a liner does not extend back to the surface of the well).
Logging: Acquisition of downhole data using tools run in the well, usually on wireline.
Perforate/

Perforating:

Piercing the casing and cement using shaped explosive charges to provide a flow path for formation fluids.
Producing/

Production:

Flowing oil and/or gas from a well to the production systems.
Production Tree: An arrangement of heavy-duty valves and fittings installed on the wellhead to control flow from the well and/or to facilitate injection operations.
Reaming: An operation to restore a wellbore to its original diameter (occasionally, a wellbore will cave in).
Seismic kilometres: The total number of kilometres of data recorded in a geophysical program.
Shut-in: A well in which the valves in the production tree have been closed to cease production or injection operation on a well.
Sidetracking: The operation of deviating a well around a fish.
Spud: The initial penetration of the ground or sea floor - the start of the drilling operation.
Suspension/

Suspend:

The temporary cessation of drilling or production operations in a well.
Well Workover: A program of work performed on an existing well.
Wellbore: The hole drilled by the drill bit.
Wellhead: Steel equipment installed at the surface of the well containing an assembly of heavy duty hangars and seals (the wellhead is used to support the weight of casing strings hung it and to contain well pressure).

2005 09 12                                               1:55 p.m.


SearchHomeBack to GovernmentContact Us


All material copyright the Government of Newfoundland and Labrador. No unauthorized copying or redeployment permitted. The Government assumes no responsibility for the accuracy of any material deployed on an unauthorized server.
Disclaimer/Copyright/Privacy Statement