GEOSCIENTIFIC PROGRAMS
Program Number
Operator/Survey
(Location) |
Vessel/
Contractor |
Start Date |
Kms Completed
(Total Planned) |
Comments |
8924-C047-002E
Chevron Canada
Resources Orphan Basin 3D seismic survey |
M/V
Geco Diamond/
WesternGeco Canada |
May
12, 2005 |
127,313 CMP km
(157,419 CMP km) |
13,659 CMP km recorded during reporting period. |
8924-C047-002E
Chevron Canada
Resources Orphan Basin 3D seismic survey |
M/V
Patriot
WesternGeco Canada |
June 22, 2005 |
86,716 CMP km
(140,894 CMP km) |
9,783 CMP km recorded during reporting period. |
8924-C149-002E
ConocoPhillips Canada/South Newfoundland 3D seismic survey |
M/V
Western Neptune/WesternGecoCanada |
June 14, 2005 |
63,955 CMP km
(87,809 CMP km) |
3,492 CMP km recorded during reporting period |
8924-G005-014P Geophysical Service Inc./Labrador Shelf 2D seismic survey |
Gulf Pacific/
Geophysical Service Incorporated |
June 17, 2005 |
8,983 km
14,225 km)
|
1,244 km recorded during reporting period. |
HIBERNIA DRILLING PROGRAM
Well/Location
(Unique Well Identifier) |
Installation |
Spud Date |
Current Depth
(Projected Total Depth) |
Current Status |
HMDC Hibernia B-16 52Z
46 45' 02.082" N
48 46' 54.945" W
Licence: PL 1001
(352B164650048451) |
Hibernia Platform
M72 (West Rig) |
March 23, 2005 |
5,161 m
(6,718 m) |
Performing rig maintenance. |
HMDC Hibernia B-16 54
46� 45� 01.427"N
48� 46� 53.654"W
(Surface)
Licence: EL 1093
(354B164650048450) |
Hibernia Platform
M71 (East rig) |
August 1, 2005 |
507 m
(8,174 m) |
Performing rig maintenance. |
TERRA NOVA DRILLING PROGRAM
Well/Location
(Unique Well Identifier) |
Installation |
Spud Date |
Current Depth
(Projected Total Depth) |
Current Status |
Petro-Canada et al Terra Nova G-90 6
46� 29� 21.445� N
48� 27� 36.854� W
Licence: PL 1002
(306G90463J0048350) |
Henry
Goodrich |
August 15, 2005 |
1,760 m
(5,943 M) |
Preparing to drill 343 mm hole section. |
WHITE ROSE DRILLING PROGRAM
Well/Location
(Unique Well Identifier) |
Installation |
Spud Date |
Current Depth
(Projected Total Depth) |
Current Status |
Husky Oil et al White Rose
B-19
46� 48� 11.20" N
48� 02� 01.43� W
Licence: PL 1006
(300B194650048000) |
Rowan Gorilla VI |
August 22, 2005 |
1,165 m
(3,218 m) |
Pressure testing BOP stack. |
Husky Oil et al White Rose B-07 3
46 46' 13.14" N
48 00' 36.92" W
Licence: SDL 1022
(303B074650048000) |
GSF
Grand Banks |
October 9, 2003 |
5,137 M
(5,137 M) |
Completing well. |
Husky Oil et al White Rose B-07 5
46 46' 14.11" N
48 00' 36.66" W
Licence: SDL 1022
(305B074650048000) |
GSF
Grand Banks |
October 6, 2003 |
1,025 m |
508
mm hole drilled, 406 mm surface casing set and cemented. |
Husky Oil et al White Rose B-07 7
46 46' 13.49" N
48 00' 38.61" W
Licence: SDL 1022
(307B074650048000) |
GSF
Grand Banks |
October 12, 2003 |
231m |
914
mm hole drilled, 762 mm conductor casing set and cemented. |
Husky Oil et al White Rose B-07 8
46 46' 14.24" N
48 00' 38.16" W
Licence: SDL 1022
(308B074650048000) |
GSF
Grand Banks |
October 2, 2003 |
231 m |
914
mm hole drilled, 762 mm conductor casing set and cemented. |
Husky Oil et al White Rose J-22 2
46 51' 39.62" N
48 03' 39.93" W
Licence: SDL 1028
(302J224700048000) |
GSF
Grand Banks |
April 24, 2004 |
1,215 m |
406
mm hole section drilled, 340 mm casing set and cemented. |
Husky Oil et al White Rose B-07 9
46 46' 14.521" N
48 00' 41.883" W
Licence: SDL 1022
(309B074650048000) |
GSF
Grand Banks |
September 22, 2004 |
4,405 m(4,405 m) |
Suspended at final total depth, production tree installed - to be
re-entered for completion at a later date. |
Husky Oil et al White Rose E-18 2
46 47' 21.414" N
48 02' 41.048" W
Licence: SDL 1024
(302E184650048000) |
GSF
Grand Banks |
September 30, 2004 |
5,390 m
(5,390 m) |
Suspended at final total depth after performing wellbore clean up and
repairing liner top � to be re-entered for completion at a later date.
|
Husky Oil et al White Rose E-18 3
46 47' 22.528" N
48 02' 38.052" W
Licence: SDL 1024
(303E184650048000) |
GSF
Grand Banks |
October 8, 2004 |
4,726 m
(4,726 m) |
Suspended at final total depth after performing wellbore clean up and
attempting perforations � to be re-entered for completion at a later
date. |
Please note that White Rose B-07 1, White Rose B-07 2, White Rose B-07
4, White Rose B-07 6 and White Rose J-22 1 have been completed and are
ready for production operations when the Sea Rose FPSO arrives on site
in 2005. Accordingly, these wells have been dropped from the weekly
status report. Please refer to the C-NLOPB�s website under RESOURCE
INFORMATION, and click on Development wells (White Rose Field) for
additional information on the status of White Rose development wells. |