Weekly
Public Status Report
Oil and Gas Activities Offshore
Newfoundland
and
Labrador
Issued as of:
August 1, 2005
(Also
available on the Internet � //www.cnlopb.nl.ca
)
GEOSCIENTIFIC
PROGRAMS
Program Number
Operator/Survey
(Location) |
Vessel/
Contractor
|
Start Date |
Kms
Completed
(Total Planned)
|
Comments |
8924-C047-002E
Chevron
Canada
Resources
Orphan
Basin
3D seismic survey |
M/V Geco Diamond/
WesternGeco
Canada |
May
12, 2005
|
83,249
CMP km
(157,419 CMP km) |
13,686 CMP km
recorded during reporting period
|
8924-C047-002E
Chevron
Canada
Resources
Orphan
Basin
3D seismic survey |
M/V Patriot
WesternGeco
Canada |
June
22, 2005
|
54,272
CMP km
(72,834 CMP km) |
13,673
CMP km recorded during reporting period |
8924-C149-002E
ConocoPhillips Canada/South Newfoundland 3D seismic survey |
M/V
Western Neptune/
Western
GecoCanada |
June
14, 2005
|
46,310
CMP km
(87,809 CMP km) |
3,121
CMP km recorded during reporting period |
8924-G005-014P
Geophysical Service Inc./Labrador Shelf 2D seismic survey |
Gulf Pacific/
Geophysical Service Inc. |
June
17, 2005
|
5,095
km
(14,225 km)
|
943
km recorded during reporting period. |
HIBERNIA
DRILLING PROGRAM
Well/Location
(Unique Well Identifier) |
Installation |
Spud
Date |
Current
Depth
(Projected Total Depth) |
Current
Status |
HMDC
Hibernia
B-16 52
46 45' 02.082" N
48 46' 54.945" W
Licence: PL 1001
(352B164650048450) |
Hibernia
Platform
M72 (West Rig)
|
March
23, 2005
|
2,860
M
(6,718 M)
|
Drilling 311 mm hole section. |
HMDC
Hibernia
B-16 53
46 45' 01.427" N
48 46' 53.654" W
Licence: PL 1001
(353B164650048450) |
Hibernia
Platform
M71 (East Rig)
|
April
8, 2005
|
5,486
M
(5,486 M)
|
Drilling operations completed-rig skidded to
Hibernia B-16 54. |
HMDC
Hibernia
B-16 54
46� 45� 01.427�N
48� 46� 53.654�W
(Surface)
Licence: EL 1093
(354B164650048450) |
Hibernia
Platform
M71 (East rig)
|
- |
0
M
(8,174 M)
|
Preparing to spud well |
TERRA
NOVA
DRILLING
PROGRAM
Well/Location
(Unique Well Identifier) |
Installation |
Spud Date |
Current
Depth
(Projected Total Depth) |
Current Status |
Petro-Canada
et al Terra Nova
F-100 4
46 29' 26.202" N
48 29' 11.664" W
Licence: PL 1002
(304F004630048150) |
Henry Goodrich |
June
17, 2005
|
4,081
M
(4,081 M)
|
Completing well |
WHITE
ROSE DRILLING PROGRAM
Well/Location
(Unique Well Identifier) |
Installation |
Spud Date |
Current
Depth
(Projected Total Depth) |
Current Status |
Husky
Oil et al White Rose B-07 3
46 46' 13.14" N
48 00' 36.92" W
Licence: SDL 1022
(303B074650048000) |
GSF
Grand Banks
|
October
9, 2003
|
5,137
M
(5,137 M)
|
Completing
Well |
Husky
Oil et al White Rose B-07 5
46 46' 14.11" N
48 00' 36.66" W
Licence: SDL 1022
(305B074650048000) |
GSF
Grand Banks |
October
6, 2003 |
1,025
M |
508 mm hole drilled, 406 mm surface casing set
and cemented. |
Husky
Oil et al White Rose B-07 7
46 46' 13.49" N
48 00' 38.61" W
Licence: SDL 1022
(307B074650048000) |
GSF
Grand Banks |
October
12, 2003
|
231 M |
914 mm hole drilled, 762 mm conductor casing set
and cemented. |
Husky
Oil et al White Rose B-07 8
46 46' 14.24" N
48 00' 38.16" W
Licence: SDL 1022
(308B074650048000) |
GSF
Grand Banks |
October
2, 2003
|
231 M |
914 mm hole drilled, 762 mm conductor casing set
and cemented. |
Husky
Oil et al White Rose J-22 2
46 51' 39.62" N
48 03' 39.93" W
Licence: SDL 1028
(302J224700048000) |
GSF
Grand Banks |
April
24, 2004
|
1,215 M |
406 mm hole section drilled, 340 mm casing set
and cemented. |
Husky
Oil et al White Rose B-07 9
46 46' 14.521" N
48 00' 41.883" W
Licence: SDL 1022
(309B074650048000) |
GSF
Grand Banks |
Sept.
22, 2004
|
4,405
M
(4,405 M)
|
Suspended
at final total depth, production tree installed - to be re-entered
for completion at a later date.
|
Husky
Oil et al White Rose E-18 2
46 47' 21.414" N
48 02' 41.048" W
Licence: SDL 1024
(302E184650048000) |
GSF
Grand Banks |
September
30, 2004
|
5,390
M
(5,390 M)
|
Suspended at final total depth after performing
wellbore clean up and repairing liner top � to be re-entered for
completion at a later date. |
Husky
Oil et al White Rose E-18 3
46 47' 22.528" N
48 02' 38.052" W
Licence: SDL 1024
(303E184650048000) |
GSF
Grand Banks |
October
8, 2004
|
4,726
M
(4,726 M)
|
Suspended at final total depth after performing
wellbore clean up and attempting perforations � to be re-entered
for completion at a later date. |
Exploration Drilling Program
Well
(Unique well identifier)
|
Installation |
Spud Date |
Current
Depth
(Projected Total Depth) |
Current Status |
Husky
Oil
Lewis Hill G-85
44 34� 18.6�N
52 57� 20.35�W
Licence: EL 1059
(300G85440052450) |
Rowan Gorilla V1 |
July
11, 2005
|
(-)* |
�Tight Hole�* |
*Lewis
Hill G-85 has been designated �tight� by the operator � all
information and materials related to this well will be held strictly
confidential until released by the operator or until the period of
confidentiality expires under the Atlantic Accord Act.
|
Contact: Canada-Newfoundland Offshore Petroleum
Board,
(709)
778-1400
.
_______________________________________
Glossary of Petroleum Terminology
BOP/BOP Stack: Blowout preventers/blowout
preventer stack - an assembly of heavy-duty valves attached to the wellhead
to control well pressure and prevent a blowout.
Casing: Steel pipe set in a well to prevent
the hole from sloughing or caving and to enable formations to be isolated
(there may be several strings of casing in a well, one inside the other).
Cementing: Pumping a liquid slurry of cement,
water and other additives behind a string of casing to isolate formations.
Completion/ Completed: The activities
necessary to prepare a well for the production of oil or gas or the
injection of water or gas into the reservoir.
Fish: An object lost (or stuck) in the wellbore
obstructing operations.
Fishing: Operations to recover fish.
Injecting: Injecting water or gas into the
resevoir for the purpose of maintaining resevoir pressure, maximizing oil
recovery and conserving resources.
Liner: A length of casing suspended from the
base of a previously installed casing string (a liner does not extend back
to the surface of the well).
Logging: Acquisition of downhole data using
tools run in the well, usually on wireline.
Perforate/ Perforating: Piercing the casing
and cement using shaped explosive charges to provide a flow path for
formation fluids.
Producing/ Production: Flowing oil and/or gas
from a well to the production systems.
Production Tree: An arrangement of heavy-duty
valves and fittings installed on the wellhead to control flow from the well
and/or to facilitate injection operations.
Reaming: An operation to restore a wellbore to
its original diameter (occasionally, a wellbore will cave in).
Seismic kilometres: The total number of
kilometres of data recorded in a geophysical program.
Shut-in: A well in which the valves in the
production tree have been closed to cease production or injection operation
on a well.
Sidetracking: The operation of deviating a
well around a fish.
Spud: The initial penetration of the ground or
sea floor - the start of the drilling operation.
Suspension/ Suspend: The temporary cessation
of drilling or production operations in a well.
Well Workover: A program of work performed on an
existing well.
Wellbore: The hole drilled by the drill bit.
Wellhead: Steel equipment installed at the
surface of the well containing an assembly of heavy duty hangars and seals
(the wellhead is used to support the weight of casing strings hung it and to
contain well pressure).