The following is being distributed at the request of the Canada-Newfoundland and Labrador Offshore Petroleum Board:

Weekly Public Status Report
Oil and Gas Activities Offshore Newfoundland and Labrador
Issued as of: July 18, 2005
(Also available on the Internet �
//www.cnlopb.nl.ca )

GEOSCIENTIFIC PROGRAMS
Program Number
Operator/Survey
(Location)
Vessel/
Contractor
Start Date Kms Completed(Total Planned) Comments
8924-C047-002EChevron Canada
Resources Orphan Basin 3D seismic survey
M/V Geco Diamond/WesternGeco Canada May 12, 2005 61,563 CMP km
(157,419 CMP km)
7,583 CMP km recorded during reporting period
8924-C047-002EChevron Canada
Resources Orphan Basin 3D seismic survey
M/V PatriotWesternGeco Canada June 22, 2005 40,599 CMP km
(72,834 CMP km)
11,508 CMP km recorded during reporting period
8924-C149-002EConocoPhillips Canada/South Newfoundland 3D seismic survey M/V Western Neptune/WesternGeco
Canada
June 14, 2005 43,189 CMP km
(87,809 CMP km)
10,192 CMP km recorded during reporting period
8924-G005-014P Geophysical Service Inc./Labrador Shelf 2D seismic survey Gulf Pacific/Geophysical Service Inc. June 17, 2005 4,152 km
(14,225 km)
362 km recorded during reporting period.
HIBERNIA DRILLING PROGRAM Well/Location
(Unique Well Identifier)
Installation Spud Date Current Depth(Projected Total Depth)

Current Status

HMDC Hibernia B-16 52 46 45' 02.082" N
48 46' 54.945" W
Licence: PL 1001
(352B164650048450)
Hibernia PlatformM72 (West Rig)

March 23, 2005

2,311 M
(6,718 M)
Drilling 311 mm hole section.
HMDC Hibernia B-16 5346 45' 01.427" N
48 46' 53.654" W
Licence: PL 1001
(353B164650048450)
Hibernia PlatformM71 (East Rig) April 8, 2005 5,486 M
(5,486 M)
Performing rig maintenance.
TERRA NOVA DRILLING PROGRAM Well/Location
(Unique Well Identifier)
Installation Spud Date Current Depth(Projected Total Depth) Current Status
Petro-Canada et al Terra Nova F-100 4
46 29' 26.202" N
48 29' 11.664" W
Licence: PL 1002
(304F004630048150)
Henry Goodrich June 17, 2005 4,081 M
(4,170 M)
Liner hole section drilled to TD, 178mm casing set prepared to cement liner.
WHITE ROSE DRILLING PROGRAM Well/Location
(Unique Well Identifier)
Installation Spud Date Current Depth(Projected Total Depth) Current Status
Husky Oil et al White Rose B-07 3 46 46' 13.14" N
48 00' 36.92" W
Licence: SDL 1022
(303B074650048000)
GSF Grand Banks October 9, 2003 5,137
(5,246 M)
Suspended at final total depth, production tree installed - to be re-entered for completion at a later date.
Husky Oil et al White Rose B-07 5 46 46' 14.11" N
48 00' 36.66" W
Licence: SDL 1022
(305B074650048000)
GSF Grand Banks October 6, 2003 1,025 M 508 mm hole drilled, 406 mm surface casing set and cemented.
Husky Oil et al White Rose B-07 7 46 46' 13.49" N
48 00' 38.61" W
Licence: SDL 1022
(307B074650048000)
GSF Grand Banks October 12, 2003 231 M 914 mm hole drilled, 762 mm conductor casing set and cemented.
Husky Oil et al White Rose B-07 8 46 46' 14.24" N
48 00' 38.16" W
Licence: SDL 1022
(308B074650048000)
GSF Grand Banks October 2, 2003 231 M 914 mm hole drilled, 762 mm conductor casing set and cemented.
Husky Oil et al White Rose J-22 2 46 51' 39.62" N
48 03' 39.93" W
Licence: SDL 1028
(302J224700048000)
GSF Grand Banks April 24, 2004 1,215 M 406 mm hole section drilled, 340 mm casing set and cemented.
Husky Oil et al White Rose B-07 9 46 46' 14.521" N
48 00' 41.883" W
Licence: SDL 1022
(309B074650048000)
GSF Grand Banks Sept. 22, 2004 4,405 M
(4,405 M)
Suspended at final total depth, production tree installed - to be re-entered for completion at a later date.
Husky Oil et al White Rose E-18 2 46 47' 21.414" N
48 02' 41.048" W
Licence: SDL 1024
(302E184650048000)
GSF Grand Banks September 30, 2004 5,390
(5,390 M)
Suspended at final total depth after performing wellbore clean up and repairing liner top � to be re-entered for completion at a later date.
Husky Oil et al White Rose E-18 3 46 47' 22.528" N
48 02' 38.052" W
Licence: SDL 1024
(303E184650048000)
GSF Grand Banks October 8, 2004 4,726 M
(4,726 M)
Re-entered to clean-up and perforate.
Husky OilLewis Hill G-85
44 34� 18.6"N
52 57� 20.35"W
Licence: EL 1059
(300G85440052450)
Rowan Gorilla V1 July 11, 2005 (-)* "Tight Hole"*
*Lewis Hill G-85 has been designated "tight" by the operator � all information and materials related to this well will be held strictly confidential until released by the operator or until the period of confidentiality expires under the Atlantic Accord Act.


Contact: Canada-Newfoundland Offshore Petroleum Board, (709) 778-1400.

_______________________________________


Glossary of Petroleum Terminology

BOP/BOP Stack: Blowout preventers/blowout preventer stack - an assembly of heavy-duty valves attached to the wellhead to control well pressure and prevent a blowout.
Casing: Steel pipe set in a well to prevent the hole from sloughing or caving and to enable formations to be isolated (there may be several strings of casing in a well, one inside the other).
Cementing: Pumping a liquid slurry of cement, water and other additives behind a string of casing to isolate formations.
Completion/Completed: The activities necessary to prepare a well for the production of oil or gas or the injection of water or gas into the reservoir.
Fish: An object lost (or stuck) in the wellbore obstructing operations.
Fishing: Operations to recover fish.
Injecting: Injecting water or gas into the reservoir for the purpose of maintaining reservoir pressure, maximizing oil recovery and conserving resources.
Liner: A length of casing suspended from the base of a previously installed casing string (a liner does not extend back to the surface of the well).
Logging: Acquisition of downhole data using tools run in the well, usually on wireline.
Perforate/Perforating: Piercing the casing and cement using shaped explosive charges to provide a flow path for formation fluids.
Producing/Production: Flowing oil and/or gas from a well to the production systems.
Production Tree: An arrangement of heavy-duty valves and fittings installed on the wellhead to control flow from the well and/or to facilitate injection operations.
Reaming: An operation to restore a wellbore to its original diameter (occasionally, a wellbore will cave in).
Seismic kilometres: The total number of kilometres of data recorded in a geophysical program.
Shut-in: A well in which the valves in the production tree have been closed to cease production or injection operation on a well.
Sidetracking: The operation of deviating a well around a fish.
Spud: The initial penetration of the ground or sea floor - the start of the drilling operation.
Suspension/Suspend: The temporary cessation of drilling or production operations in a well.
Well Workover: A program of work performed on an existing well.
Wellbore: The hole drilled by the drill bit.
Wellhead: Steel equipment installed at the surface of the well containing an assembly of heavy duty hangars and seals (the wellhead is used to support the weight of casing strings hung it and to contain well pressure).

2005 07 26                   2:45 p.m.

SearchHomeBack to GovernmentContact Us


All material copyright the Government of Newfoundland and Labrador. No unauthorized copying or redeployment permitted. The Government assumes no responsibility for the accuracy of any material deployed on an unauthorized server.
Disclaimer/Copyright/Privacy Statement