Weekly Public Status Report
Oil and Gas Activities Offshore Newfoundland and Labrador
Issued as of: December 6,2004
(Also available on the Internet - //www.cnopb.nfnet.com)
GEOSCIENTIFIC PROGRAMS
Program Number
Operator/Survey
(Location)
|
Vessel/Contractor |
Start Date |
Kms Completed
(Total Planned) |
Comments |
No surveys active at this time. |
|
|
|
|
HIBERNIA DRILLING PROGRAM
Well/Location
(Unique Well Identifier)
|
Installation |
Spud Date |
Current Depth
(Projected Total Depth) |
Current Status |
HMDC Hibernia B-16 48
46 45' 02.139" N
48 46' 54.862" W
Licence: PL 1001
(348B164650048450)
|
Hibernia Platform
M72 (West Rig)
|
August 22, 2004 |
6,651
(6,708 M) |
178 mm production liner cemented -
preparing to run completion operations. |
HMDC Hibernia B-16 50
46 45' 01.140" N
48 46' 53.737" W
Licence: PL 1001
(350B164650048450)
|
Hibernia Platform
M71 (East Rig)
|
November 11, 2004 |
2,573
(6,999 M) |
Drilling 311 mm production hole. |
TERRA NOVA DRILLING PROGRAM
Well/Location
(Unique Well Identifier)
|
Installation |
Spud Date |
Current Depth
(Projected Total Depth)
|
Current Status |
Petro-Canada et al Terra Nova
G-90 4
46 29' 21.500" N
48 27' 37.100" W
Licence: PL 1002
(304G904630048150)
|
Henry Goodrich |
January 20, 2002 |
3,980
(3,980 M)
|
Terra Nova G-90 4 was terminated on
November 30, 2004 - Henry Goodrich moved to Southeast glory hole to
spud Terra Nova F-88 3. |
Petro-Canada et al Terra Nova
F-88 3
46 27' 19.897"N
48 27' 41.920"W
Licence: PL 1002
(303F884630048150 |
Henry Goodrich |
December 2, 2004 |
951
(3,603 M) |
Waiting on weather to run BOPs. |
WHITE ROSE DRILLING PROGRAM
Well/Location
(Unique Well Identifier)
|
Installation |
Spud Date |
Current Depth
(Projected Total Depth)
|
Current Status |
Husky Oil et al White Rose B-07 3
46 46' 13.14" N
48 00' 36.92" W
Licence: SDL 1022
(303B074650048000)
|
Glomar Grand Banks |
October 9, 2003 |
970 M |
508 mm hole drilled, 406 mm surface
casing set and cemented. |
Husky Oil et al White Rose B-07 5
46 46' 14.11" N
48 00' 36.66" W
Licence: SDL 1022
(305B074650048000)
|
Glomar Grand Banks |
October 6, 2003 |
1,025 M |
508 mm hole drilled, 406 mm surface
casing set and cemented. |
Husky Oil et al White Rose B-07 7
46 46' 13.49" N
48 00' 38.61" W
Licence: SDL 1022
(307B074650048000)
|
Glomar Grand Banks |
October 12, 2003 |
231 M |
914 mm hole drilled, 762 mm conductor
casing set and cemented. |
Husky Oil et al White Rose B-07 8
46 46' 14.24" N
48 00' 38.16" W
Licence: SDL 1022
(308B074650048000)
|
Glomar Grand Banks |
October 2, 2003 |
231 M |
914 mm hole drilled, 762 mm conductor
casing set and cemented. |
Husky Oil et al White Rose J-22 2
46 51' 39.62" N
48 03' 39.93" W
Licence: SDL 1028
(302J224700048000)
|
Glomar Grand Banks |
April 24, 2004 |
1,215 M |
406 mm hole section drilled, 340 mm
casing set and cemented. |
Husky Oil et al White Rose B-07 9
46 46' 14.521" N
48 00' 41.883" W
Licence: SDL 1022
(309B074650048000)
|
Glomar Grand Banks |
September 22, 2004 |
1,015 M |
508 mm hole drilled, 340 mm surface
casing set and cemented. |
Husky Oil et al White Rose E-18 2
46 47' 21.414" N
48 02' 41.048" W
Licence: SDL 1024
(302E184650048000)
|
Glomar Grand Banks |
September 30, 2004 |
1,011 M |
508 mm hole drilled, 340 mm surface
casing set and cemented.
|
Husky Oil et al White Rose E-18 3
46 47' 22.528" N
48 02' 38.052" W
Licence: SDL 1024
(303E184650048000)
|
Glomar Grand Banks |
October 8, 2004 |
1,013 M |
508 mm hole drilled, 340 mm surface
casing set and cemented |
Husky Oil et al White Rose E-18 1
46 47' 21.687" N
48 02' 38.261" W
Licence: SDL 1024
(300E184650048000)
|
Glomar Grand Banks |
October 13, 2004 |
4,243 M |
Waiting on weather to pull anchors. |
Please note that White Rose B-07 1, White
Rose B-07 2, White Rose B-07 4, White Rose B-07 6 and White Rose J-22 1 have
been completed and are ready for production operations when the Sea Rose
FPSO arrives on site in 2005. Accordingly, these wells have been dropped
from the weekly status report. Please refer to the C-NOPB�s Web site under
RESOURCE INFORMATION, and click on Development wells (White Rose Field) for
additional information on the status of White Rose development wells.
Contact: Canada-Newfoundland Offshore
Petroleum Board, (709) 778-1400.
_______________________________________
Glossary of Petroleum
Terminology
BOP/BOP Stack: Blowout
preventers/blowout preventer stack - an assembly of heavy-duty valves
attached to the wellhead to control well pressure and prevent a blowout.
Casing: Steel
pipe set in a well to prevent the hole from sloughing or caving and to
enable formations to be isolated (there may be several strings of casing in
a well, one inside the other).
Cementing: Pumping
a liquid slurry of cement, water and other additives behind a string of
casing to isolate formations.
Completion/Completed: The
activities necessary to prepare a well for the production of oil or gas or
the injection of water or gas into the reservoir.
Fish: An
object lost (or stuck) in the wellbore obstructing operations.
Fishing: Operations
to recover fish.
Injecting: Injecting
water or gas into the resevoir for the purpose of maintaining resevoir
pressure, maximizing oil recovery and conserving resources.
Liner: A
length of casing suspended from the base of a previously installed casing
string (a liner does not extend back to the surface of the well).
Logging: Acquisition
of downhole data using tools run in the well, usually on wireline.
Perforate/Perforating: Piercing
the casing and cement using shaped explosive charges to provide a flow path
for formation fluids.
Producing/Production: Flowing
oil and/or gas from a well to the production systems.
Production Tree: An
arrangement of heavy-duty valves and fittings installed on the wellhead to
control flow from the well and/or to facilitate injection operations.
Reaming: An
operation to restore a wellbore to its original diameter (occasionally, a
wellbore will cave in).
Seismic kilometres: The
total number of kilometres of data recorded in a geophysical program.
Shut-in: A
well in which the valves in the production tree have been closed to cease
production or injection operation on a well.
Sidetracking: The
operation of deviating a well around a fish.
Spud: The
initial penetration of the ground or sea floor - the start of the drilling
operation.
Suspension/Suspend: The
temporary cessation of drilling or production operations in a well.
Well Workover: A
program of work performed on an existing well.
Wellbore: The
hole drilled by the drill bit.
Wellhead: Steel
equipment installed at the surface of the well containing an assembly of
heavy duty hangars and seals (the wellhead is used to support the weight of
casing strings hung it and to contain well pressure).
2004 12
09
12:10 p.m.
|