Weekly Public Status Report
Oil and Gas Activities Offshore Newfoundland and Labrador
Issued as of: August 9, 2004
(Also available at: //www.cnopb.nfnet.com/)

GeoScientific Programs

Program Number
Operator/Survey (Location)

Vessel/
Contractor

Start
Date

Kms Completed
(Total Planned)

Comments

8924-C047-001E
Chevron Canada
(Orphan Basin)
Veritas Vantage/
Veritas Geophysical
June 26, 2004

2,654
(7,421)

699 kms recorded during the week.
8924-G005-013P
GSI
(Labrador)
BinHai 512/C-GOSL June 29, 2004

4,856
(9,712)

514 kms recorded the week.
8924-C149-001E
ConocoPhillips
(South Newfoundland)
GSI Admiral/GSI August 9, 2004

0
(5,400)

Program authorized August 9.
Hibernia Drilling Program

Well / Location
(Unique well identifier)

Installation

Spud
Date

Current
Depth (Projected Total Depth)

Current Status

HMDC Hibernia B-16 46
46 45' 01.198" N
48 46' 53.653" W
Licence: PL 1001
(342B164650048450)
Hibernia Platform M71(East Rig) May 19,
2004
5,403
(5,403 M)
Drilling operations completed - rig skidded to B-16 49.
HMDC Hibernia B-16 47
46 45' 01.967" N.
48 46' 54.944" W
Licence: PL 1001
(347B164650048450)
Hibernia Platform
M72 (West Rig)
June 2, 2004 5,344
(5,344 M)
178 mm liner set and cemented - preparing to run 178 mm completion tubing and associated equipment.
HMDC Hibernia B-16 49
46 45' 01.312" N
48 46' 53.654" W
Licence: PL 1001
(349B164650048450)
Hibernia Platform
M71 (East Rig)


-

0
(4,590 M)
Currently performing rig maintenance.

Terra Nova Drilling Program
Well / Location
(Unique well identifier)
Installation Spud
Date
Current
Depth (Projected Total Depth)
Current
Status
Petro Canada et al Terra Nova
F-100 2
46 29' 26.040" N
48 29' 11.229" W
Licence: Pl 1002
(302F004630048150)
Henry Goodrich June 13, 2004 4,527
(4,527 M)
Well completeed as of August 8, 2004 - rig mobilized to L-98 11.
Petro-Canada et al Terra Nova
L-98 11
46 27' 42.166" N
48 29' 51. 174" W
Licence: PL 1002
(311L984630048150)
Henry Goodrich

-
0
(5,339 M)
Preparing to spud well.

 

White Rose Drilling Program
Well / Location
(Unique well identifier)
Installation Spud
Date
Current
Depth (Projected Total Depth)
Current
Status

Husky Oil et al White Rose
B-07 1
46 46' 14.31" N .
48 00' 38.42" W
Licence: SDL 1022
(300B074650048000)

Glomar Grand Banks

October 18, 2003 3,658 M

Well completed.

Husky Oil et al White Rose
B-07 2
46 46' 14.04" N .
48 00' 36.40" W
Licence: SDL 1022
(302B074650048000)

Glomar Grand Banks

October 4, 2003 4,610 M Well completed.

Husky Oil et al White Rose
B-07 3
46 46' 13.14" N .
48 00' 36.92" W
Licence: SDL 1022
(303B074650048000)

Glomar Grand Banks

October 9, 2003 970 M 508mm hole drilled, 406 mm surface casing set and cemented. 

Husky Oil et al White Rose
B-07 4
46 46' 13.41" N .
48 00' 38.35" W
Licence: SDL 1022
(304B074650048000)

Glomar Grand Banks

October 14, 2003 3,998M

Well completed.

Husky Oil et al White Rose
B-07 5
46 46' 14.11" N .
48 00' 36.66" W
Licence: SDL 1022
(305B074650048000)

Glomar Grand Banks

October 6, 2003 1,025 M 508 mm hole drilled, 406mm surface casing set and cemented.

Husky Oil et al White Rose
B-07 6
46 46' 13.56" N .
48 00' 38.87" W
Licence: SDL 1022
(306B074650048000)

Glomar Grand Banks

October 14, 2003 3,719 M

Production tree installed and well suspended - to be re-entered for completion at a later date.

Husky Oil et al White Rose
B-07 7
46 46' 13.49" N .
48 00' 38.61" W
Licence: SDL 1022
(307B074650048000)

Glomar Grand Banks

October 12, 2003 231 M 914mm hole drilled, 762 mm conductor casing set and cemented.

Husky Oil et al White Rose
B-07 8
46 46' 14.24" N .
48 00' 38.16" W
Licence: SDL 1022
(308B074650048000)

Glomar Grand Banks

October 2, 2003 231 M 914mm hole drilled, 762 mm conductor casing set and cemented. 
Husky Oil et al White Rose
J-22 1
46 51' 38.81" N .
48 03' 40.27" W
Licence: SDL 1028
(300J224700048000)
Glomar Grand Banks April 15, 2004 2,780 M Currently drilling 311 mm production hole section.
Husky Oil et al White Rose
J-22 2
46 51' 39.62" N .
48 03' 39.93" W
Licence: SDL 1028
(302J224700048000)
Glomar Grand Banks

April 24, 
2004

1,215 M

406mm hole section drilled, 340mm casing set and cemented.

Contact: Canada-Newfoundland Offshore Petroleum Board, (709) 778-1400.

______________________

Glossary of Petroleum Terminology

BOP/BOP Stack: Blowout preventers/blowout preventer stack - an assembly of heavy-duty valves attached to the wellhead to control well pressure and prevent a blowout.

Casing: Steel pipe set in a well to prevent the hole from sloughing or caving and to enable formations to be isolated (there may be several strings of casing in a well, one inside the other).

Cementing: Pumping a liquid slurry of cement, water and other additives behind a string of casing to isolate formations.

Completion/Completed: The activities necessary to prepare a well for the production of oil or gas or the injection of water or gas into the reservoir.

Fish: An object lost (or stuck) in the wellbore obstructing operations.

Fishing: Operations to recover a fish.

Injecting: Injecting water or gas into the reservoir for the purpose of maintaining reservoir pressure, maximizing oil recovery and conserving resources.

Liner: A length of casing suspended from the base of a previously installed casing string (a liner does not extend back to the surface of the well).

Logging: Acquisition of downhole data using tools run in the well, usually on wireline.

Perforate/Perforating: Piercing the casing and cement using shaped explosive charges to provide a  flow path for formation fluids

Producing/Production: Flowing oil and/or gas from a well to the production systems.

Production tree: An arrangement of heavy-duty valves and fittings installed on the wellhead to control flow from the well and/or to facilitate injection operations.

Reaming: An operation to restore a wellbore to its original diameter (occasionally, a wellbore will cave in).

Seismic kilometers completed: The total number of kilometers of data recorded in a  geophysical program.

Shut-in: A well in which the valves in the production tree have been closed to cease production or injection operation on a well.

Sidetracking: The operation of deviating a well around a fish.

Spud: The initial penetration of the ground or seafloor - the start of the drilling operation.

Suspension/Suspend: The temporary cessation of drilling or production operations in a well.

Well workover:  A program of work performed on an existing well.

Wellbore: The hole drilled by the drill bit.

Wellhead: Steel equipment installed at the surface of the well containing an assembly of heavy duty hangars and seals (the wellhead is used to support the weight of casing strings hung from it and to contain well pressure).

2004 08 12                                          10:40 a.m.