NLIS 2 February 19, 2002 (Environment) Environmental Assessment Bulletin Environment Minister Ralph Wiseman has announced the following events relative to the Environmental Assessment Act. NEW UNDERTAKINGS REGISTERED:
The proponent proposes to construct a polychlorinated biphenyl (PCB) storage facility in Happy Valley - Goose Bay at the existing storage yard at the North Side Diesel Generating Station. The storage facility will be a new pre-engineered, pre-assembled metal building measuring approximately 3.8 metres long, 3.1 metres wide and 2.8 metres high. The building will be supported on a concrete foundation and have a secondary-containment system. The facility will accommodate PCB-contaminated electrical equipment and transformer oil that has been removed from service in Hydro's Transmission and Rural Operations (Labrador) operating area. It is anticipated that the storage facility will be required for a period of 25 years, or until all PCB-contaminated electrical equipment in the Labrador area has been removed from service. Work on the facility is anticipated to commence in October 2002. The undertaking was registered on February 19, 2002. Public comments are due March 26, and the minister's decision is due April 5. The minister encourages all interested parties to become involved and to make comments known. Further information may be obtained by contacting the Director of Environmental Assessment at (709) 729-2562 or toll-free: 1-800-563-6181 or by mail to:
Environmental Assessment Information is on the government Web site at: www.gov.nl.ca/env 2002 02 19 3:20 p.m. |
|||||
|