Weekly Public Status Report
Oil and Gas Activities Offshore Newfoundland and Labrador
Issued as of: June 25, 2001
(Also available at: //www.cnopb.nfnet.com)

Geoscientific Programs Operator/Survey
(Location)
Vessel Start Date Km's Completed (Total Planned) Comments
8924-G005-00SP GSI/2-D Seismic South Newfoundland MV Professor Poloskov May 5, 2001 3,217
(14,400)
Survey suspended June 22, 2001. 814 km. acquired this week
8924-G004-003E Chevron/3-D Seismic South Flemish pass Veritas Viking 1 June 23, 2001 716
(7,139)
Program is a continuation of survey started in 2000
8924-G005-006P GSI/2-D Seismic South Newfoundland MV Professor Poloskov June 24, 2001 88
(18,518)
88 km acquired this week

 

Hibernia Drilling Program
Well / Location Installation Spud
Date
Current
Depth (Projected Total Depth)
Current Status
HMDC Hibernia B-16 26
46 45' 01.427"      N; Lat.
48 46'53.487"W: Long.
Licence: PL 1001
Hibernia Platform
M71 (East Rig)

April 21, 2001 7,050 M
(8,162 M)
Preparing to pressure test 273 x 244 mm casing

 

HMDC Hibernia B-16 27
46 45' 2.139" N; Lat
48 46' 54.529" W; Long.
Licence: PL 1001
Hibernia Platform
M72 (West Rig)
April 25, 2001  5,886 M
(5,873 M)
Preparing to run 178 mm liner

 

Terra Nova Drilling Program
Well / Location Installation Spud
Date
Current
Depth (Projected, Total Depth)
Current
Status
Petro Canada et al Terra Nova G-90 1
46 29'21" N; Lat.
48 27'37" W; Long.
Licence:  SDL 1032
enry Goodrich July 23, 1999  4,130 M
(4,130 M)
Well completed June 24, 2001**

 

Terra Nova site Preparation
Vessel  Location Start
Date
Current
Status
Tideway Seahorse* Terra Nova Field

May 2, 2001

Rockdumping activities completed June 22, 2001***

*   Petro Canada has contracted the Tideway Seahorse, a fall pipe (rock dumping) vessel, to bury the flowlines and control umbilicals at the Terra Nova field. The vessel commenced operation at the Terra Nova site on May 2, 2001

**  Petro Canada et al Terra Nova G-90 2W has been completed as of June 12, 2001, and subsequently will be removed from future reports.

***Tideway Seahorse rockdumping activities at the Terra Nova field were completed as of June 22, 2001, and subsequently will be removed from future reports.

Contact: Canada-Newfoundland Offshore Petroleum Board, (709) 778-1400

________________________

Glossary of Petroleum Terminology

BOP/BOP Stack: Blowout preventers/blowout preventer stack - an assembly of heavy-duty valves attached to the wellhead to control well pressure and prevent a blowout.

Casing: Steel pipe set in a well to prevent the hole from sloughing or caving and to enable formations to be isolated (there may be several strings of casing in a well, one inside the other).

Cementing: Pumping a liquid slurry of cement, water and other additives behind a string of casing to isolate formations.

Completion/Completed: The activity necessary to prepare a well for the production of oil or gas or the injection of water or gas into the reservoir.

Fish: An object lost (or stuck) in the wellbore obstructing operations.

Fishing: Operations to recover fish.

Injecting: Injecting water or gas into the resevoir for the purpose of maintaining resevoir pressure, maximizing oil recovery and conserving resources.

Liner: A length of casing suspended from the base of a previously installed casing string (a liner does not extend back to the surface of the well).

Logging: Acquisition of downhole data using tools run in the well, usually on wireline.

Perforate/Perforating: Piercing the casing and cement using shaped explosive charges to provide a  flow path for formation fluids

Producing/Production: Flowing oil and/or gas from a well to the production systems.

Production tree: An arrangement of heavy duty valves and fittings installed on the wellhead to control flow from the well and/or to facilitate injection operations.

Reaming: An operation to restore a wellbore to its original diameter (occasionally, a wellbore will cave in).

Seismic kilometers completed: The total number of kilometers of data recorded in a  geophysical program.

Shut-in: A well in which the valves in the production tree have been closed to cease production or injection operation on a well.

Sidetracking: The operation of deviating a well around a fish.

Spud: The initial penetration of the ground or seafloor - the start of the drilling operation.

Suspension/Suspend: The temporary cessation of drilling or production operations in a well.

Well workover:  A program of work performed on an existing well.

Wellbore: The hole drilled by the drill bit.

Wellhead: Steel equipment installed at the surface of the well containing an assembly of heavy duty hangars and seals (the wellhead is used to support the weight of casing strings hung from it and to contain well pressure).

2001 06 29                                                  10:05 a.m. 


SearchHomeBack to GovernmentContact Us


All material copyright the Government of Newfoundland and Labrador. No unauthorized copying or redeployment permitted. The Government assumes no responsibility for the accuracy of any material deployed on an unauthorized server.
Disclaimer/Copyright/Privacy Statement