GEOPHYSICAL
Program Number Operator/Survey
(Location
Vessel Start Date Km's Complete
(Total Planned)
Comments
8924-G026-005P Geco-Prakla/2-D Seimic

(Southern Grand Banks)
Akademik
Shatskiy
May 7,
2000
 6,415
(9,000)
1,273 km acquired since last report
8924-P028-009E Petro-Canada/3-D Seismic
(Flemish Pass)
Geco Triton June 6, 2000 66,996
(92,160)
16,486 km acquired since last report.  
8924-C004-002E Chevron Canada/3D seismic 
(Flemish Pass)
Veritas Viking II June 19, 2000 7,049
(106,500)
7,049 km acquired since last report. 
892-G005-004P GSI/2Seismic 
(Northern Grand Banks)
Polar Duke June 24, 2000 2,102
(12,6000)
1,061 kms acquired since last report

 

Hibernia Drilling Program
Well / Location Installation Spud
Date
Current
Depth (Projected Total Depth)
Current Status
HMDC Hibernia B-16 8
46 45'1.4"N; Lat.
48 46'53.3"W: Long.
Licence: PL 1001
Hibernia Platform
M71 (East Rig)

June 27, 2000     516 M
(6,384 M)
Testing BOP stack

 

HMDC Hibernia B-16 20Y
46 45'1.9"N; Lat.
48 46'54.5"W: Long.
Licence: PL 1001
Hibernia Platform
M72 (West Rig)
 May 17, 2000  4,506 M
(6,093 M)

 

Drilling 311mm-hole section.

 

Terra Nova Drilling Program
Well / Location Installation Spud
Date
Current
Depth (Projected, Total Depth)
Current
Status
Petro Canada et al Terra Nova L-98 1
46 27'42.3" N; Lat.
48 29'51.1" W; Long.
Licence:  SDL 196
Glomar Grand Banks August 14, 1999  4,183 M
(4,183 M)
Suspended.
Petro Canada et al Terra Nova L-98 2
46 27'42" N; Lat.
48 29'51" W; Long.
Licence:  SDL 196
Henry Goodrich August 14, 1999  4,813 M
(4,813 M)
Suspended.
Petro Canada et al Terra Nova L-98 3
46 27'42" N; Lat.
48 29'50" W; Long.
Licence:  SDL 196
Glomar Grand Banks August 11, 1999  3,681 M
(3,681 M)
Suspended.
Petro Canada et al Terra Nova G-90 2Y
46 29'22" N; Lat.
48 27'38" W; Long.
Licence:  SDL 1032
Henry Goodrich

July 19, 1999

 4,085 M
(5,008 M)

T4esting BOP stack
Petro Canada et al Terra Nova G-90 3
46 29'22" N; Lat.
48 27'38" W; Long.
Licence:  SDL 1032
Glomar Grand Banks July 21, 1999  1,420 M
(5,216 M)
Suspended.
Petro Canada et al Terra Nova G-90 1
46 29'21" N; Lat.
48 27'37" W; Long.
Licence:  SDL 1032
Glomar Grand Banks July 23, 1999  1,415 M
(3,795 M)
Suspended.

 

HUSKY OIL Drilling Program
Well / Location Installation Spud
Date
Current
Depth (Projected, Total Depth)
Current
Status
Husky Oil et al Cape Race
N-68
46 37'45.3" N; Lat.
48 24'49.5" W; Long.
Licence:  SDL 1025
Transocean Sedco-Forex 714 June 27, 2000  2,126 M
(3,002 M)
Drilling 311 mm-hole section.

 

Terra Nova Site Preparation
Vessel Location Start Date Current
Status
Smit Pioneer Terra Nova Field April 27, 2000 Installing flow lines.
CSO Marianos Terra Nova Field June 4, 2000 Working on Spider Bouy.

 

Contact: Canada-Newfoundland Offshore Petroleum Board, (709) 778-1400

________________________

Glossary of Petroleum Terminology

BOP/BOP Stack: Blowout preventers/blowout preventer stack - an assembly of heavy-duty valves attached to the wellhead to control well pressure and prevent a blowout.

Casing: Steel pipe set in a well to prevent the hole from sloughing or caving and to enable formations to be isolated (there may be several strings of casing in a well, one inside the other).

Cementing: Pumping a liquid slurry of cement, water and other additives behind a string of casing to isolate formations.

Completion/Completed: The activity necessary to prepare a well for the production of oil or gas or the injection of water or gas into the reservoir.

Fish: An object lost (or stuck) in the wellbore obstructing operations.

Fishing: Operations to recover fish.

Injecting: Injecting water or gas into the resevoir for the purpose of maintaining resevoir pressure, maximizing oil recovery and conserving resources.

Liner: A length of casing suspended from the base of a previously installed casing string (a liner does not extend back to the surface of the well).

Logging: Acquisition of downhole data using tools run in the well, usually on wireline.

Perforate/Perforating: Piercing the casing and cement using shaped explosive charges to provide a  flow path for formation fluids

Producing/Production: Flowing oil and/or gas from a well to the production systems.

Production tree: An arrangement of heavy duty valves and fittings installed on the wellhead to control flow from the well and/or to facilitate injection operations.

Reaming: An operation to restore a wellbore to its original diameter (occasionally, a wellbore will cave in).

Shut-in: A well in which the valves in the production tree have been closed to cease production or injection operation on a well.

Sidetracking: The operation of deviating a well around a fish.

Spud: The initial penetration of the ground or seafloor - the start of the drilling operation.

Suspension/Suspend: The temporary cessation of drilling or production operations in a well.

Well workover:  A program of work performed on an existing well.

Wellbore: The hole drilled by the drill bit.

Wellhead: Steel equipment installed at the surface of the well containing an assembly of heavy duty hangars and seals (the wellhead is used to support the weight of casing strings hung from it and to contain well pressure).