October 25, 1999
(Mines and Energy)
The following is being distributed at the request of the Canada-Newfoundland
Offshore Petroleum Board:
Weekly Public Status Report
Oil and Gas Activities Offshore Newfoundland and Labrador
Issued: October 25, 1999
(Also available at: //www.cnopb.nfnet.com)
Hibernia Drilling Program |
|
|
|
|
Well / Location |
Installation |
Spud
Date |
Current
Depth (Projected Total Depth) |
|
HMDC Hibernia B-16 16
46 45'02.2"N; Lat.
48 46'58.3"W: Long.
Licence: PL 1001 |
Hibernia Platform
M72 (West Rig) |
July 26, 1999 |
4,870 M
(4,870 M) |
Completeing Well |
HMDC Hibernia B-16 17
46 45'02.2"N; Lat.
48 46'58.34"W: Long.
Licence: PL 1001 |
Hibernia Platform
M71 (East Rig)
|
July 16, 1999 |
4,095 M
(4,130 M) |
Drilling a 216 mm hole |
HMDC Hibernia B-16 12
46 45'02.3"N; Lat.
48 46'58.4"W: Long.
Licence: PL 1001 |
Hibernia Platform
M72 (East Rig)
|
Sept. 12, 1999 |
512 M
(6,158 M)
|
Suspended. |
Terra Nova Drilling Program |
|
|
|
|
Well / Location |
Installation |
Spud
Date |
Current
Depth (Projected Total Depth) |
Current
Status |
Petro Canada et al Terra Nova L-98 1
46 27'42.3" N; Lat.
48 29'51.1" W; Long.
Licence: SDL 196 |
Glomar Grand Banks |
August 14, 1999 |
3,757 M
(4,321 M) |
Waiting on weather |
Petro Canada et al Terra Nova L-98 2
46 27'42" N; Lat.
48 29'51" W; Long.
Licence: SDL 196 |
Glomar Grand Banks |
August 14, 1999 |
1,211 M
(4,955 M) |
Suspended |
Petro Canada et al Terra Nova L-98 3
46 27'42" N; Lat.
48 29'50" W; Long.
Licence: SDL 196 |
Glomar Grand Banks |
August 11, 1999 |
1,415 M
(3,775 M) |
Suspended |
Petro Canada et al Terra Nova G-90 2
46 29'22" N; Lat.
48 27'38" W; Long.
Licence: SDL 1032 |
Glomar Grand Banks |
July
19, 1999 |
1,418 M
(5,008 M) |
Suspended. |
Petro Canada et al Terra Nova G-90 3
46 29'22" N; Lat.
48 27'38" W; Long.
Licence: SDL 1032 |
Glomar Grand Banks |
July 21, 1999 |
1,420 M
(5,216 M) |
Suspended |
Petro Canada et al Terra Nova G-90 1
46 29'21" N; Lat.
48 27'37" W; Long.
Licence: SDL 1032 |
Glomar Grand Banks |
July 23, 1999 |
1,415 M
(3,795 M) |
Suspended
|
Exploration Wells |
|
|
|
|
Well / Location |
Installation |
Spud
Date |
Current
Depth (Projected Total Depth) |
Current
Status |
Husky et al White
Rose N-30
46 49'49.5" N;Lat.
48 03'45.5" W;Long.
Licence: SDL 1028 |
Bill Shoemaker |
August 13, 1999 |
3,290 M
(3,290 M) |
Well suspended. Rig released on October 23,
1999 |
Geophysical |
|
|
|
|
Program No.
Operator/Survey
(Location) |
Vessel |
Start Date |
Km's completed
(Total km's
planned) |
Comments |
8924-G026-003P
Geco-Prakla
(Northern Grand Banks) |
M.V. Geco Searcher |
June 15, 1999 |
7,900
(7,900) |
196 km acquired this week. Survey completed
October 24. |
NOTE: All geophysical surveys authorized over the Newfoundland
Offshore Area for 1999 are now complete. No further activity reports will be issued
until further authorizations are granted.
Contact: Canada-Newfoundland Offshore
Petroleum Board, (709) 778-1400
________________________
Glossary of Petroleum Terminology
BOP/BOP Stack: Blowout preventers/blowout preventer stack - an assembly of
heavy-duty valves attached to the wellhead to control well pressure and prevent a blowout.
Casing: Steel pipe set in a well to prevent the hole from sloughing or
caving and to enable formations to be isolated (there may be several strings of casing in
a well, one inside the other).
Cementing: Pumping a liquid slurry of cement, water and other additives
behind a string of casing to isolate formations.
Completion/Completed: The activity necessary to prepare a well for the
production of oil or gas or the injection of water or gas into the reservoir.
Fish: An object lost (or stuck) in the wellbore obstructing operations.
Fishing: Operations to recover fish.
Injecting: Injecting water or gas into the resevoir for the purpose of
maintaining resevoir pressure, maximizing oil recovery and conserving resources.
Liner: A length of casing suspended from the base of a previously
installed casing string (a liner does not extend back to the surface of the well).
Logging: Acquisition of downhole data using tools run in the well, usually
on wireline.
Perforate/Perforating: Piercing the casing and cement using shaped
explosive charges to provide a flow path for formation fluids
Producing/Production: Flowing oil and/or gas from a well to the production
systems.
Production tree: An arrangement of heavy duty valves and fittings
installed on the wellhead to control flow from the well and/or to facilitate injection
operations.
Reaming: An operation to restore a wellbore to its original diameter
(occasionally, a wellbore will cave in).
Shut-in: A well in which the valves in the production tree have been
closed to cease production or injection operation on a well.
Sidetracking: The operation of deviating a well around a fish.
Spud: The initial penetration of the ground or seafloor - the start of the
drilling operation.
Suspension/Suspend: The temporary cessation of drilling or production
operations in a well.
Well workover: A program of work performed on an existing well.
Wellbore: The hole drilled by the drill bit.
Wellhead: Steel equipment installed at the surface of the well containing
an assembly of heavy duty hangars and seals (the wellhead is used to support the weight of
casing strings hung from it and to contain well pressure).
1999 10 25 3:55 p.m.
|