NHOC/PCP PORT AU PORT No. 1

SUMMARY OF PRODUCTION TEST RESULTS

 

 

DST #1

DST #2

DST #3

DST #4

EXTENDED TEST(#5)

Stratigraphic Unit

St. George Group

St. George Group

St. George/ Table Head Group

Table Head Group

Table Head Group

Gross Interval

3916.1 m

to

3950.7 m

3517.1 m

to

3559.5 m

3471.7 m

to

3476.2 m

3459.2 m

to

3462.2 m

3459.2 m

to

3462.2 m

Flow Rates

         

Oil

   

1528 BPD

1742 BPD

See Note 2.

Gas

   

2.6 MMCFD

2.3 MMCFD

 

Water

2500 BPD

1100 BPD

985 BPD

252 BPD

 

Choke Size

   

24/64"

32/64 "

 

Comments

Utilized Nitrogen assist during test.

Utilized Nitrogen assist during test.

   

Paraffin & salt plugging during test.

 

Terms: BPD = Barrels per day.

MMCFD = Million cubic feet per day.

Notes:

1. The above information has been summarized from the NHOC/PanCanadian Port au Port No. 1 FINAL WELL REPORT as prepared by Newfoundland Hunt Oil Company Inc., July 1996.

2. During the extended test, a total of 5012 bbls of oil, 9.2 million cubic feet of gas and 2734 bbls of water were produced. Production rates varied and the results appear to indicate the possibility of a limited reservoir or complex geology at the well location.

3. The oil gravity in all cases was 51 degrees API.


SearchHomeBack to GovernmentContact Us


All material copyright the Government of Newfoundland and Labrador. No unauthorized copying or redeployment permitted. The Government assumes no responsibility for the accuracy of any material deployed on an unauthorized server.
Disclaimer/Copyright/Privacy Statement